Specification Product Information In our complex and challenging lives, finding simple joys can lead to a sense of peace and tranquility. That's where these exquisite ceramic coffee mugs come in. Designed in a classic white shade, they can also be customi
SYI can supply the Centrifugally Cast Ductile Iron Restrained Joint Socket and Spigot Pipe according to ISO 10804, ISO2531, EN545, EN598, from DN80 to DN2000, including K7, K8, K9, K10,K12, K14, C20, C25, C30, C40, C50, C64, C100, with the coating of Meta
Side Window grinding wheel is made of diamond powder, using metal or alloy powder as the bonding material, through mixing, hot pressing or cold pressing sintering. Application range: Widely used in grinding high quality side window automotive glass.
3 seconds self-made strong bubbles: The result of swirling air intake with bubbles in supercharged nozzle makes the gas uniformly merge into the water, and the bubbles are rich and delicate.
1/2 drive adjustable click type torque wrench is a relatively new products, self-developed by Shanghai UB Machinery.1/2 drive adjustable click type torque wrenches have large view double window scale as well as push/pull end cap to secure the set torque
● Dry-dial, magnetic drive, Resistance to exterior magnet interference● Selected high quality materials for steady & reliable characteristic● Vacuum sealed register ensures the dial kept free from fog and keep the reading clear in a long term service
End Feed Fittings are traditionally used in the plumbing industry to connect copper pipes on hot and cold water supply systems. We have types from coupling, copper elbows, tees, to end cap connectors and have size from 6mm - 219mm
1. 5 port solenoid valves.2. These solenoid valves are smaller and have a higher flow.3. The offers the user different sized valves which are mounted on the same manifold.
1. Direct acting type and normally closed mode, flexible in direction change.2. No need to add oil for lubrication.3. Several valves can be installed integratedly to save installation space.
0:FC-2017No:21:We support FOB/EXW/CIF price.2:Payment Terms: T/T 30% deposit first, After finished goods pay off the rest of balance.3:Delivery Method: Deliver goods to ShangHai Port.4:Lead time:20-25 working days5:This cabinet can be customized by custom